URGENT MARKET MESSAGE on temporary transmission capacity limitation |
|
|
Message ID: |
UMM-GTNTT-001 |
|
Time and Date of UMM publishing:: |
20.12.2013, 08:00 CET |
|
Message type and history of prior publications regarding the same event: |
New message |
|
Balancing zone: |
Gas transmission network for transit transmission |
|
Affected Point: |
IP Strandja/Malkoclar - exit |
|
Asset type affected: |
Gas pipeline |
|
Asset unit affected: |
Gas pipeline section CS Strandja – GMS Malkoclar – looping |
|
Starting time of capacity change: |
01.01.2014, 08:00 CET |
|
Estimated time at which the assets concerned will be partly/or wholly available again: |
18.07.2014, 16:00 CET |
|
Estimated duration of unavailability or uncertainty: |
199 days |
|
Cause: |
Gas pipeline repair with repair of linear part |
|
Technical capacity (of the asset concerned during normal situation), (kWh per gas day): |
470 202 500 kWh/d |
|
Flow capacity influenced (kWh per gas day): |
22 142 500 kWh/d |
|
Available capacity of the asset concerned during the outage, (kWh per gas day): |
448 060 000 kWh/d |
|
Additional information: |
|