URGENT MARKET MESSAGE on temporary transmission capacity limitation

Message ID:

 UMM-GTNTT-001

Time and Date of UMM publishing::

20.12.2013, 08:00 CET

Message type and history of prior publications regarding the same event:

 New message

Balancing zone:

Gas transmission network for transit transmission

Affected Point:

IP Strandja/Malkoclar - exit

Asset type affected:

Gas pipeline

Asset unit affected:

Gas pipeline section CS Strandja – GMS Malkoclar – looping

Starting time of capacity change:

 01.01.2014, 08:00 CET

Estimated time at which the assets concerned will be partly/or wholly available again:

18.07.2014, 16:00 CET  

Estimated duration of unavailability or uncertainty:

 199 days

Cause:

Gas pipeline repair with repair of linear part

Technical capacity (of the asset concerned during normal situation), (kWh per gas day):

 470 202 500 kWh/d

Flow capacity influenced (kWh per gas day):

   22 142 500 kWh/d

Available capacity of the asset concerned  during the outage, (kWh per gas day):

 448 060 000 kWh/d

Additional information: