|
UNAVAILABILITIES OF GAS FACILITIES UMM DETAILS |
|
|
Parameters |
Details |
|
Message ID |
UMM_BTG-GTNTT_201710829-04_001 |
|
Event status |
Active |
|
Type of unavailability |
Planned |
|
Type of event |
Transmission system unavailability |
|
Publication date/time |
2017-07-31T10:00:00+03:00 |
|
Event start |
2017-08-29T05:00:00+03:00 |
|
Event stop |
2017-09-05T05:00:00+03:00 |
|
Unit of measurement |
kWh/d |
|
Unavailable capacity |
69415040,8 kWh/d for the gas days 29.08 – 30.08.2017 109315040 kWh/d for the gas days 31.08 – 01.09.2017 17811040,8 kWh/d for the gas days 02.09 – 04.09.2017 |
|
Available capacity |
39900000 kWh/d for the gas days 29.08 – 30.08.2017 0 kWh/d for the gas days 31.08 – 01.09.2017 91504000 kWh/d for the gas days 02.09 – 04.09.2017 |
|
Technical capacity |
109315040 |
|
Reason of unavailability |
CS Petrich maintenance works; Works along gas pipeline section PF Piperevo - CS Petrich; Maintenance works of Ukrtransgaz on the Trans-Balkan pipeline |
|
Remarks |
Estimated duration of unavailability or uncertainty: 168 hours Unavailability of the affected assets: 63 % for the gas days 29.08 – 30.08.2017 100 % for the gas days 31.08 – 01.09.2017 16 % for the gas days 02.09 – 04.09.2017 The date and time parameters in the message are published in UTC.
|
|
Balancing zone |
21Y000000000027C |
|
Affected asset or unit |
Kulata (BG)/Sidirokastron (GR) (exit) |
|
Affected asset or unit EIC code |
21Z000000000020C |
|
Market participant |
BULGARTRANSGAZ EAD |
|
Market participant code |
21X-BG-A-A0A0A-C |